9C
run June 2010
Target
issues
* Target number #425 YO VD7 + coldline (Cu)
* Beam on target (no converter)
* Mass markers: enriched 13CO gas (was not necessary: enough
current from natural abundance)
* GPSseparator
* Extraction electrode 40 mm
* Uht(GPS,CCV)=29.95 kV, Uht(GPS, HT_target)=29.9612 kV,
Uht(trap)=30.00kV, Elec05=220 V
Yield measurements
From the logbook:
* Wed 9/6
ca
1.5e3/muC estimated 9C yields, on top 2/3 (in betas) 25Ne contamination
* Fri 11/6
25Ne : ca 2.5e4/muC
26Ne : ca 2.8e3/muC
72Kr
: ca 4e3/muC
Could
not get 9C again.
Experimental
issues
* Beam to 2nd beamline
* IS445
Tuning
* Molecular beam CO
* REXTRAP timing free-running relative to protons pulses
* use of stripping foils (25 ug/cm2) to go from C4+ to C6+
ISOLDE
Transmission A=29: GPS.FC490=2.67 nA, Trap inj plate 2.07 nA => 77%
Low energy
Stable
beam 13CO
Tperiod=20
ms, Tbreed=8 ms (optimised for 4+), Icoll~110 mA, molecule broke-up inside the
EBIS
Trap inj plate=55 pA,
RFQ.FC20=13 pA (4+) =>Trap-EBIS efficiency=6% efficiency
Radioactive 9C
No currents
measured anywhere.
Linac transmission and energy:
85%
RFQ.FC20 to XL20.FC50 for A/q 4, 2.87 MeV/u
82% RFQ.FC20
to XL20.FC50 for O7+ A/q 2.2857, 2.87 MeV/u
50-68%
RFQ.FC20 to exp FC for O7+ A/q 2.2857, 2.87 MeV/u (3 mm colimator in front of
set-up)
Total estimated
transmission (radioactive beam)
GPS x
Trap_EBIS x Linac_collimator
0.77 *
0.06 * 0.60 = 2.7%
Delivered
beams
* 9C: very low count rate at exp (-> run cancelled)
From logbook Thu 10/6:
Beam composition from last night data:
* >500 pps from EBIS most likely 18O
* 50 pps from GPS maybe 9Be coming as BeO (cannot be 25Mg
-> too heavy)
* small contribution from 4He (could be beam created at the
wrong potential in the EBIS)
Setting
summary
ISOLDE settings saved as:
GPS_SEP_10-06-04_Ar_30250V.csv
GPS_REX_10-06-09_HT29950V_plasma160V_A29.csv
REX settings saved as:
REX-30kV_2010-06-09_GPS_9C16O_flatpotential.xml
BTS-30kV_2010-06-07_GPS_13C16O_flatpotential.xml
EBIS_100609_1900_GPS_9C16O_9C4.csv
100609_1902_SEP_Aq2.25_9c4+_2.87MeVu_set-up_no-foil.csv
100609_1902_Aq2.25_9c4+_2.87MeVu_set-up_no-foil.csv
Technical
problems
* Problems with EBIS cathode, had to run with injected O2 to
maintain enough electron beam current
* FC communication problem most of the set-up time was used
to debug control system
* charging-up problem in connection with scaling at low A/q
Comments
/ Lessons learned
* Linac can be run at very low amplitude A/q=2.25
* Not enough time to set-up higher energy, would be interesting
to see what energy can be reached with such light beams