Minutes from REX meeting 2006-06-07
Present:
REX low energy part
* Witch tried
to take stable beam over the week end. The local ion source failed but has now
been repaired.
* EBIS
and trap are running ok. Slow extraction is in principle operational.
REX linac
* The
9-gap is now up and running. The vacuum leak has been fixed. RF power is slowly
increased to condition the cavity.
* A first
tuning of the linac with stable beam is planned beginning of next week.
* There is no reason at this point to cancel the
run.
*
Concrete blocs will be installed next week along the linac to shield properly X-rays from the
cavities.
Another
short status meeting will take place next Wednesday.
Minutes taken by Didier Voulot