Mg run June 2006
Target issues
* UC2-320, W surface, laser ionization
* mass markers Mg/Na and Mn/K
* separator setup at 30.2 kV
* Yield check
Measured two times. The
integration by hand gives for 29Mg ca. 1.4E6/uC and for 31Mg ca. 1.2E5/uC. Both
numbers might be off by +-30%.
REX issues
Isotopes accelerated: radioactive
29Mg9+ and 31Mg9+
breeding
time 28 ms, peak charge close to 9+
Currents: ~0.5 pA seen on 29Mg on BTS.FC20
~0.5 pA
seen on 29Mg9+ on RFQ.FC20
No currents seen for 31Mg
31Mg beam very clean at Miniball
Efficiencies:
GPS.FC490 to REXTRAP inj
plate: 70% or up to 100%. The reading of
TRAP: with 27 pA of 23Na on the trap
inj plate and 14 pA on BTS.FC20 (maybe 10% Ne) => 50% trap efficiency
The total trap + EBIS + separator efficiency is 10%
for 23Na9+ for 28 ms breeding time
LINAC: Transmission for A/q=3.5 75%
Energy
for A/q=3.5 2.75 MeV/u
technical problems:
7-gap 3 tripped from
time to time
BD kept on stopping, now
fixed
Protons going to the beam
dump even with proton request on
GPS.FC490 reads
unreliable values below 100 pA (a factor 2 too small)
Control unit for
IH-structure failed twice
Bugs in mass scanner
B-field
read-out doesn’t work
Saving name
of mass scan
Scaling of the working
sets fails sometime, particular problem with XSEP.QP10
Line heating stopped
one night
Difficult to setup the mass
separator and Linac as the Witch magnet was switched on until the beginning of
the run
BEN.FC40 not working; BEN.FC100
has to be operated manually
comments:
* No presetting for Linac,
started late.
* The low count rate stated
by Miniball
1. was in fact
not a factor 1000 lower than expected. The value of 8E5 30Mg/s was not an
exceptional yield at Miniball but from the target.
Oct 2004 8E5 30Mg/s from ISOLDE
2003 2E4
30Mg/s from ISOLDE
2004 4E4
32Mg/s from ISOLDE
2. had not a discrepancy of 100 between 29Mg and 31Mg
* Why A=29 could be seen on
the GPS.SC483 and not A=31 was because of the yield factor difference of 12
(not 2 as stated in the beginning).
* Summary: REX lost quite
so time trying to track down none existing anomalies!
* The 29Mg beam could not
be used be the experiment due to the beam contamination
At Miniball 55-60% of A=29 seen (ratio Al:Mg:Na = 27:6:1)
4-45% of lighter element (14N or 16O from
EBIS)
The move of the REXTRAP
roughing pumps have resulted in 4 times larger Ne peaks in the REXEBIS residual
gas spectrum.
lesson:
Once again: the complete machine
must have been working before the first beam time!