Minutes of the REX integration meeting on WednesdayFriday,13.05.2005, 08.13.065.2005

 

 

Participants: Georgi Georgiev, Pierre Delahaye, Thomas Sieber, Mats Lindroos (chair), Fredrik Wenander, Nikolai Trofimov, Nicolas David, Romain Savreux, Pierre Delahaye.

 

 

1. General Issues

-        The current 70Se run will continue until at least Monday evening.

-        On Friday 10.06., there will be a meeting with Paul Van den Bergh and several members of the BDI group to discuss the work on the REX beam diagnostics.

-        Also on Friday there will be a meeting between Mats, Maurizio Vretenar and Trevor Linnecar concerning possible schemes to replace Thomas, who will leave ISOLDE by the end of August.

-        There are still problems with the PC for the trap controls. Romain will take care for installation of a new PC.

-        A callout list for REX operation has been fixed. It looks as follows:

Thomas Sieber 164239

Fredrik Wenander 162991

Pierre Delahaye 163644

Romain Savreux 100450207519

 

-          Starting on Tuesday 17.05., we will have a daily short REX meeting at 16.00 in the ISOLDE kitchen to discuss the startup and the status of the running Xe experiment.

-           

2. Current REX Experiment. TRAP

-        The trap works well, showing an efficiency for the stable SeC of about 50%.

-        We use the 70Se19+ (A/q=3.684). EBIS efficiency is at 5%.

-        The Linac has been scaled from A/q=4 to the Se. Transmission and spot were checked with the nearby 22Ne6+. Even at the slightly wrong A/q (0.5% off) we reach 75% transmission at a good spot at the target.

-        With a reported SeCO yield of 3E5 per uC this translates to max. 7000 pps at the MINBALL.

-        First results from the experiment look promising. There are about 30 counts per hour in the Coulex peak.

-Pierre

-           and Fredrik had the problem of discharges in the trap, means there was more current measured at the exit than injected from the test source. Nicolas David found a broken cable at a transfer element. The bad contact was responsible for the discharges.

-The test ion source runs stable now after the regulation has been improved.

-The application for the frequency scan of the trap has to be improved.

 

3. TrapEBIS

-        The emittance measurements done by Romain and Ivan have been finished. The results can only partially be compared to earlier results (Friedhelm Ames). Furthermore at 60 keV there seems to be a limitation given by the voltage limit in the emittance scanner. Romain and Ivan will write a report about their measurements.

-        The emittance scanner will be dismounted in the beginning of next week for being shipped back to LMU.

-The bad transmission through the mass separator, which has been observed on Thursday, was partially caused by two switched cables in one of the steerers.

-There was again a problem with the cabling of the Wago module for the high voltage cassettes, which could be repaired by Nicolas.

-The transmission through the separator is at the moment 70- 80%, due to the high residual gas pressure, the current is about a factor 10 higher than usual.

-Stable beam for Linac optimization will be available on Monday.

-The baking after the run will be done now with the old NEG strips.

-One day is needed to optimize beam transport through the BTS.

-Dry injection (without electron beam and magnetic field) into the EBIS is still problematic because of the high noise level on the electrodes.

 

4. EBISLinac

-        There are problems with the motor generator on the EBIS platform. It makes irregular noise during the startup. Nicolas will have a look at this after the run.

-        The MCP in the mass scanner box seems to be not working properly. We will look into this next week and replace the system by a new one if necessary.

-        Fredrik noticed that some of his Faraday cups in the low energy section are working unstable. The reason seems to be on the control system side because the cups show reasonable values on an independent Keithley.

-           

-          BERTRONIX could not solve the principle problem of the limited power level of the 200 MHz amplifier. Also the unstable operation at 10% duty cycle is still a problem. The amplifier could be tuned to ~100kW output power on a dummy load. It is running quite stable now at 30Hz, 600us. So we can expect closed loop operation on the cavity at about 85 kW.

 

54. LinacControl System

-        The problem of switch offs due to reverse power at the 200 MHz amplifier could be solved by Johannes Broere. It was caused by an internal timing problem between preamp and final stage. The limitation in duty cycle (max. 30Hz, 500us) due to overheating in the amplifier cavity is remaining.

-        The FC in sect. 5 is not working, we will check if there is a relation to the FC problems in the low energy part.

 

6. Control System

-        After looking into the application Nikolai has developed for the REX rf-system, Thomas and Jose Marques from AB-RF agree that this application is more than suitable to be used for REX operation and diagnostics. There are some details to be added for data saving and A/q scaling. Nikolai estimated he would need two weeks to complete it. In June his priority is on the tests with the magnet power supplies, so it might be beginning of July until we can use the application during the runs.

-        An additional Unix PC will be placed now among the REX terminals. It shall be used for Nikolais tests and also for the new rf-controls.

-        Notes from a meeting on 24.05. and some correspondences concerning the discussions between the REX team and CO about the future development of the REX control system can be found attached to these minutes.

-        Mats is currently trying to find somebody who shall participate in the work on the EBIS control system after 01. July. The main goal is to make the programs on the FEC compatible to the new passarelle. In a second line, modifications (slow extraction) are discussed.

-The BD FEC is still stopping from time to time, Sylvestre Catin has been informed about this.

-Nikolai found that there are not enough Ethernet connections in the network rack, where he wants to connect his Front end computer.

 

 

Minutes by Thomas