ISOLDE consolidation

Subproject 2.2 (Building 170 Class C laboratory)

Minutes of the 2nd meeting on access control

held on 25 July 2001

Present: C. Chollet, G. Daems, U. Koester, E. Kugler, T. Nilsson, F. Pirotte, N. Rama

 

1. The controlled area comprises hall 170, attached building 197 (2 levels) and building 115

2. Entrance for persons from lower level (parking) via power supply house through a small dedicated area between the 2 door openings with the following equipment and procedures:

3. Entrance for medium size equipment from lower level through a remotely controlled door at the side of the

turnstile. The following procedures would be applied:

4. Entrance for big equipment from lower level through the sas and the sliding door

5. Entrance for persons from upper level via building 601 (door to be created at Lausanne end of building 601)

and a small dedicated area to be built in the space between buildings 601 and 115

6. Entrance for big material (cars etc) at upper level

7. It seems to be useful to know the number of persons present at any time