224Ra run 29-30 August 2011
Target
issues
* Target number #457 UC W-surf
* Beam on target (no converter)
* Mass markers: Na, Mn, Rb
* GPS separator
* Extraction electrode 69 mm (real distance)
* Uht(GPS,
CCV)=30.20 kV, Uht(trap, CCV)=30000 V, Elec05=190 V
Yield measurements
Experimental
issues
* Beam to Miniball
* IS475
Tuning
* Slow extraction from EBIS
* REXTRAP timing free-running relative to protons pulses
ISOLDE
74% transmission from GPS.FC490 to
TRAP injection plate for 238U, few pA
Low energy
Stable beam
Only a quick test with 238U
Linac transmission
and energy:
No stripper foils. WITCH magnets
0.1 and 3T.
Transmission from RFQ.FC20 to XL65.FC50
- 84% for A/q = 4 at 2.82 MeV/u
- 55% for 224Ra52+ (4.3077) at 2.82 MeV/u
Total
transmission (radioactive beam)
HRS.FC490_to_trap x Trap_EBIS x Linac
0.71*0.023*0.55=0.9%
Delivered beams
224Ra52+
TRAP HT=30000 V, Trap gas=7.5 V
With T_period= 400 ms and T_breed=396 ms, I_coll 187 mA => trap+EBIS=2.3%
Prot.current: 1.8uA 2964ppp
Total cycles: 13/26
RA0.FC90 7.1 pA
On MB FC 6 epA -> 7E5 part/s
Setting summary
For GPS we used:
GPS_SEP_30kV_#457_2011-08-22-39K.csv
GPS_TAP_30kV_#457_2011-08-22-39K.csv
REX low energy settings saved as:
110829_1538_TRAP_GPS_224Ra
110829_1538_BTS_GPS_224Ra
EBIS_110829_1528_GPS_224Ra52+_1.4%_slow_extraction
REX
separator and linac settings saved as:
110829_1536_SEP_Aq4.3077_224Ra52+_MB
110829_1536_Aq4.3077_224Ra52+_MB
Technical problems
* The target and line
heated dropped at the beginning of the run due to a PLC problem.
Comments / Lessons learned
* Full set-up done in one day (GPS to MB), definitely too short to find optimum
settings.
* The GPS mass factor for 238U was different from 23Na. Caused initial beam
confusions.