ISOLDE consolidation project meeting 6
Project web site at: http://isolde-consolidation.web.cern.ch/isolde-consolidation/
Minutes at: http://isolde-consolidation.web.cern.ch/isolde-consolidation/minutes/minutes.htm
20/6/2001
Present: R. Catherall, G-J.Focker, U. Georg, T. Giles, E.Kugler, J.Lettry,
Franck Locci, S.Marzari, G.Mornacchi, T.Nilsson, M.Lindroos
- The consolidation of the off-line separator and the the pump stands
includes a total refurbishment of most power supplies, new controls and new
instrumentation. The power group has made a proposal for the power side and
an additional budget request has been made to the sector to cover this. The
control group will do a study for 1 October for the control side. The aim is
to use the same hardware as at the on-line facility so that the off-line can
be integrated into the general ISOLDE controls. Furthermore, this permits
the CO and PO group to use the off-line as a test bench for future
implements at the on-line facility. The priority for both groups,
considering the manpower situation, is evidently the on-line facility. The
off-line facilities will not be covered by PS piquet service. Jacques
Lettry's presentation can be found here.
- Next meeting will take place in September and will be dedicated to the
resonant laser ion source.
Minutes by Mats Lindroos